Incora™ Now Supplies the Customer with 2000+ Kits Every Week Across Multiple Global Locations

DSC07148

Business Challenge

A large aircraft engine manufacturer was relying on its historical system for distributing C-class hardware.

In order to ensure parts were available at the point of use, a series of Direct Line Feed Carousels were introduced across their production facilities.

However, the solution was not designed to be a control measure for the parts. Through continuous improvement projects, it was clear that a more advanced delivery solution for C-class hardware was required in order to meet the increased production volumes and aerospace quality requirements.

4PL

Incora Solution

Incora implemented a fully customized kitting solution tailored to the customer’s specifications.

Each kit provided a consolidated quantity of material for a specific part of the engine build and was delivered directly to the corresponding build area.

The kits were further designed to be:

  • Fully traceable with an audit trail for all parts and kits
  • User-friendly, with layouts sequenced to meet build requirements while improving efficiency and build productivity
  • Tamper-proof to ensure delivery of exact quantities needed
  • Cost saving by reducing total acquisition cost through competitive part pricing
  • Environmentally friendly with returnable and reusable packaging
chemical-data-management-765×665-1

Results

Through Incora’s Kitting Services, the customer was able to create long-term savings, reduce complexity and waste and remove non-value-add internal activity.

Operators had easy access to everything needed for part build.

This streamlined operations in several ways:

  • 33% reduction in engine build time: The kits reduced their engine build time from 60 to 40 hours
  • 100% of required product available: All necessary parts were guaranteed to be in kit
  • Improved shop floor capacity: Kitting solution allowed the customer to remove the large carousels and redesign their production line
  • Reduction in Foreign Object Debris (FOD): Missing parts easily identified and reported
  • Simple implementation: The solution was designed so it could be easily implemented across global facilities
  • Reduced inventory: Achieved through line feed solutions and improved capacity planning

We Transform Supply Chain Management.